The way to resolve Concrete batching plant waste-water
February 12, 2024
Concrete mixing plant in the operation will be a steady stream of dirty water, these dirty water both for the enterprise and the surrounding environment is a more difficult to deal with the problem. If placed in the site, it is necessary to establish a special pool to hold, increasing the cost of the site. If blindly discharged to the surrounding area, it is also a very difficult to rectify the environment of the dirty spot. Often factories encounter such situations, it is necessary to introduce scientific means to deal with it.
Dirty water from concrete mixing plant is difficult to deal with, but it is not without a way to get rid of it. First of all, it should be determined in the thought process, resolutely not to pollute the environment as a prerequisite. Then you need to establish a special dirty water holding pool for the waste-water precipitation process. Digging a water pool although it will increase the cost of some sites, but the waste-water stored in the water pool after precipitation, can be repeated many times after the use of invisible but also reduces the investment in the work process. In addition, after the precipitation of the water can also be flushed on the site to reduce dust, reducing the percentage of dust in the air of the concrete mixing plant.
Concrete mixing plant discharge water pool also need to be regularly removed, the bottom of the sludge is too thick will affect the use of the pool. Waste-water can also be used similar to domestic waste-water wells buried method, digging wells filled, take the upper layer of water to do the concrete mixing plant ready-mixed supplemental water.
concrete mixer ,cement silo and batching machine